Fraser Shipyards, Inc.

Recent Projects

Fraser Shipyards is called upon for all varieties of repairs, lengthening, repowering, new construction and more. Here are a few of our most recent projects.

[Click on photos for a larger view]


U.S. Park Service barge construction

Fraser Shipyards recently built the 70-foot long, 65-ton Greenstone II, a double-skinned fuel barge that was commissioned by the U.S. National Park Service.

U.S. Coast Guard

The U. S. Coast Guard cutter Alder undergoing minor repairs during her off season, in one of our dry docks during Summer 2008.

U.S. Coast Guard Cutter Mackinaw

Aerial View of Fraser Shipyards

USCGC Hollyhock

In for a routine drydocking.

USCGC Hollyhock

A look from above.

Str. American Victory

Str. Kaye E. Barker and M/V St. Clair

Tug Joyce VanEnkevort

In December 2009, the Tug Joyce VanEnkevort came into drydock. This picture shows the day it was going to come out of drydock and they flooded the dock. With the below zero temperatures, it created the steam you see in the picture.

Tug Joyce VanEnkevort

Building A New Barge

Fraser Shipyards is building a new barge.